I spent the day touring school buildings with the President of ATS&R and an architect (both are architects). Their firm was awarded the contract to drawing up a review and comment for Plan B to present to the Minnesota Dept of Education. I’ve speculated in an earlier post about the possibility they simply put in a bid to collect a little pocket change resulting in a crumby report that would be nixed by the MDE. After spending six hours with them that’s not my impression. I’ll be meeting with them tonight and we’ll tour more buildings tomorrow morning. they only have three weeks to get it done. They’ll have to haul gluteus maxi-mus.
About the author
Related Posts
September 15, 2008
Doty misses the point
August 9, 2009
Thanks for the advertising
December 17, 2009