In the same story linked to in the previous post the architectural firm did some frenzied backpedaling.
Now they assure us that they are not designing a stadium and that term should never have been used (duh!) No, no. They are only designing practice fields………$7 million practice fields…….
I wonder how much the School Board would have spend on a full fledged stadium?