{"id":2930,"date":"2010-05-04T15:21:01","date_gmt":"2010-05-04T20:21:01","guid":{"rendered":"http:\/\/lincolndemocrat.com\/?p=2930"},"modified":"2017-03-02T00:49:26","modified_gmt":"2017-03-02T05:49:26","slug":"bidding-on-the-next-45-million-project","status":"publish","type":"post","link":"https:\/\/lincolndemocrat.com\/?p=2930","title":{"rendered":"Bidding on the next $45 million project"},"content":{"rendered":"<p>There is <a href=\"http:\/\/www.duluthnewstribune.com\/event\/article\/id\/167137\/publisher_ID\/36\/\">a legal action<\/a> in process to stop the building of the western  middle school at the Wheeler site. That&#8217;s not stopping the Superintendebt and his fantastic four who will approve bid packages for the $45 million project at a special board meeting tonight at the CAB.<\/p>\n<p>Here&#8217;s the agenda:<\/p>\n<p>Duluth Public Schools<br \/>\nSpecial School Board Meeting<br \/>\nTuesday, May 4, 2010 5:15 PM<br \/>\nHistoric Old Central High School &#8211; Board Room<br \/>\n1. Call to Order<br \/>\n2. Roll Call<br \/>\n3. Public Comment as Related to Agenda Items Listed Below <!--more--><br \/>\n4. Bid 1170 &#8211; Food Service Equipment at Lincoln-Piedmont Elementary<br \/>\nBid Line #25 -Food Service Equipment -Hockenbergs Food Service Equipment &#038; Supply &#8211;<br \/>\n$309,664.00<br \/>\nThe total cost of the contract related to Bid #1170 -Food Service Equipment at Lincoln<br \/>\nPiedmont Elementary School as listed above is $309,664.00, which remains within the<br \/>\nbudgeted amount at this site.<br \/>\nRecommendation: It is recommended the School Board approve entering into a contract with<br \/>\nthe firm listed above on their low responsive bid as shown on the Bid Tab and Letter of<br \/>\nRecommendation, as provided in response to Bid #1170 -Food Service Equipment at Lincoln-<br \/>\nPiedmont Elementary School.<br \/>\n5. Bid 1179 &#8211; Lincoln Piedmont Shcool Mechanical Equipment Package<br \/>\nLine #1 -Air Terminal Units -TMS Johnson, Inc. &#8211; $25,775.00<br \/>\nLine #2 -Displacement Diffusers -TMS Johnson, Inc. -55,000.00<br \/>\nLine #3 -Boilers and Accessories -RM Cotton Company- $94,820.00<br \/>\nLine #4 -Air-cooled Condensing Unit -ABE Environmental Systems, Inc.- $6,950.00<br \/>\nLine #5 -Air-cooled Scroll Water Chiller -Schwab Vollhaber Lubratt, Inc. &#8211; $$66,800.00<br \/>\nLine #6 -Plate Type Energy Recovery Units &#8211; Schwab Vollhaber Lubratt, Inc. &#8211; $29,690.00<br \/>\nLine #7 -Modular Energy Recovery Ventilation Units &#8211; Schwab Vollhaber Lubratt , Inc.-<br \/>\n$118,700.00<br \/>\nLine #8 -Modular Air Handling Units &#8211; Schwab Vollhaber Lubratt, Inc. &#8211; $53,630.00<br \/>\nThe total cost of the contracts related to Bid #1179 -Lincoln Piedmont School Mechanical<br \/>\nEquipment Package as listed above is $451,365.00, which remains within the budgeted amount<br \/>\nat this site.<br \/>\nRecommendation: It is recommended the School Board approve entering into contracts with<br \/>\nthe firms listed above based on their low responsive bid as shown on the Bid Tab and Letter of<br \/>\nRecommendation, as provided in response to Bid#1179 -Lincoln Piedmont School Mechanical<br \/>\nEquipment Package.<br \/>\n6. Bid 1180 &#8211; Western Middle School Bid Package #1<br \/>\nWork Scope #1 -Site Earthwork, Excavation and Site Utilities -Veit &#038; Company &#8211;<br \/>\n$5,239,500.00<br \/>\nWS #2 -Site Concrete -Hovland, Inc. &#8211; $245,000.00<br \/>\nThe total cost of the contracts related to Bid #1180, Bid Package #1 -West Middle School as<br \/>\nlisted above is $5,484,500.00, which remains within the budgeted amount at this site.<br \/>\nRecommendation: It is recommended the School Board approve entering into contracts with<br \/>\nthe firms listed above based on their low responsive bid as shown on the Bid Tab and Letter of<br \/>\nRecommendation, as provided in response to Bid#1180-West Middle School, Bid Package #1.<br \/>\n?<br \/>\n7. Bid 1181 &#8211; Asbestos Abatement at Denfeld High School<br \/>\nAsbestos Abatement -Mavo Systems, Inc. &#8211; $228,400.00<br \/>\nThe total cost of the contract related to Bid #1181 -Asbestos Abatement at Denfeld High<br \/>\nSchool as listed above is $228,400.00, which remains within the budgeted amount at this site.<br \/>\nRecommendation: It is recommended the School Board approve entering into a contract with<br \/>\nthe firm listed above based on their low responsive bid as shown on the Bid Tab and Letter of<br \/>\nRecommendation, as provided in response to Bid#1181 -Asbestos Abatement at Denfeld High<br \/>\nSchool.<br \/>\n8. Bid 1183 &#8211; Lincoln Piedmont School<br \/>\nWS #3 -Building Concrete Work &#8211;Kelleher Construction, Inc. &#8211; $904,669.00<br \/>\nWS #4 -Precast Concrete -Hanson Structural Precast Midwest, Inc. &#8211; $253,358.00<br \/>\nWS #5 -Unit Masonry -Harbor City Masonry, Inc. &#8211; $2,007,750.00<br \/>\nWS #6 -Structural Steel\/Metal Fabrication -Supply -Dynamic Structural Steel, LLC &#8211;<br \/>\n$571,800.00<br \/>\nWS #7 -Steel Erection -Structural &#038; Metal Fabrications &#8211; Supply -Northern Industrial<br \/>\nErectors, Inc. &#8211; $163,492.00<br \/>\nWS #8 &#038; 13 -Carpentry &#038; Overhead\/Coiling Doors-Lipe Brothers Construction, Inc. &#8211;<br \/>\n$285,600.00<br \/>\nWS #9 -Waterproofing &#038; Damproofing -Kremer &#038; Davis, Inc. &#8211; $59,600.00<br \/>\nWS #11 -Joint Sealers -American Masonry Restoration &#8211; $34,684.00<br \/>\nWS #12 -Doors, Frames and Hardware -Northern Door &#038; Hardware, Inc. &#8211; $206,495.00<br \/>\nWS #14 -Aluminum Entrances, Storefronts, Curtain Walls, Alum.Windows, Glass and Glazing &#8211;<br \/>\nCapital City Glass, Inc. &#8211; $345,324.00<br \/>\nWS #15 -Drywall, Plaster &#038; Stucco -Zintl, Inc. &#8211; $261,849.00<br \/>\nWS #16 -Tile -Superior Tile and Terrazzo, Inc. -$111,210.00<br \/>\nWS #17 -Acoustical and Metal Ceilings &#8211; Flament-Hampshire, Inc. &#8211; $124,250.00<br \/>\nWS #18 -Wood Flooring -FLR Sanders, Inc. &#8211; $46,300.00<br \/>\nWS #19 -Carpet\/Resilient Flooring -Johnson Carpet, Tile and Linoleum Co. &#8211; $155,900.00<br \/>\nWS #20 -Terrazzo -Twin City Tile and Marble Co. &#8211; $269,680.00<br \/>\nWS #21 -Painting -Steinbrecher Painting, Inc. &#8211; $105,500.00<br \/>\nWS #22 -Miscellaneous Specialties -Kendell Doors and Hardware, Inc. &#8211; $57,651.00<br \/>\nWS #23 -Lockers -Olympus Locker and Storage Products &#8211; $21,387.00<br \/>\nWS #24 -Operable Partitions\/Accordian Doors -Hufcor Minnesota &#8211; $32,898.00<br \/>\nWS #26 -Athletic Equipment -H &#038; B Specialized Products, Inc. &#8211; $22,634.00<br \/>\nWS #27 -Finish Carpentry -Haldeman-Homme, Inc. &#8211; $359,657.00<br \/>\nWS #28 -Window Treatments -Custom Drapery and Blinds by Michael Esch &#8211; $26,500.00<br \/>\nWS #29 -Passenger Elevators -Schindler Elevator Corporation &#8211; $53,210.00<br \/>\nWS #30 -Fire Protection Systems -Ahern Fire Protection &#8211; $117,066.00<br \/>\nWS #31 -Mechanical -MD Mechanical, Inc. &#8211; $2,432,000.00<br \/>\nWS #32 -Electrical -Electrical Systems, Inc. &#8211; $1,340,200.00<br \/>\nWS #33 -Demolition, Earthwork &#038; Site Utilities -Northland Constructors of Duluth, LLC &#8211;<br \/>\n$1,535,211.00<br \/>\nWS #34 -Landscaping -AJ&#8217;s Lawncare, Inc. &#8211; $47,500.00<br \/>\nWS #35 -Chain Link Fences and Gates -Century Fence Company &#8211; $11,186.00<br \/>\nThe total cost of the contracts related to Bid #1183 -Lincoln Piedmont Elementary School as<br \/>\nlisted above is $12,664,261.00, which remains within the budgeted amount at this site.<br \/>\nRecommendation: It is recommended the School Board approve entering into contracts with<br \/>\n?<br \/>\nthe firms listed above based on their low responsive bid as shown on the Bid Tab and Letter of<br \/>\nRecommendation, as provided in response to Bid#1183 -Lincoln Piedmont School.<br \/>\n9. Change Order # 4 &#8211; Bid #1168, BP #3 &#8211; Eastern High School Footings Foundations and<br \/>\nRetaining Walls &#8211; (Contract #0331) &#8211; Northland Concrete and Masonry Company, LLC<br \/>\nBid #1168, BP #3 -Eastern High School Footings Foundations and Retaining Walls -(Contract<br \/>\n#0331) &#8211; Change Order #4 -Northland Concrete and Masonry Company, LLC<br \/>\nRecommendation: It is recommended the School Board approve Change Order #4 to the<br \/>\ncontract with -Northland Concrete and Masonry Company, by adding $175,900.00 for Bid<br \/>\nAlternate #4 the concession building footings and foundation resulting in a revised contract total<br \/>\nof $1,492,253.00.<br \/>\n10. Resolution B-5-10-2752 &#8211; Authorizing the Purchase of Real Property from the Duluth Missabe<br \/>\nand Iron Range Railway Company Located Near Chestnut Street<br \/>\nAttached is Resolution B-5-10-2752 &#8211; Authorizing the Purchase of Real Property from the Duluth<br \/>\nMissabe and Iron Range Railway Company Located Near Chestnut Street.<br \/>\nRecommendation: It is recommended that the Duluth School Board approve Resolution B-5-10-<br \/>\n2752 &#8211; Authorizing the Purchase of Real Property from the Duluth Missabe and Iron Range<br \/>\nRailway Company Located Near Chestnut Street.<br \/>\n11. Adjournment <\/p>\n","protected":false},"excerpt":{"rendered":"<p>There is a legal action in process to stop the building of the western middle school at the Wheeler site. That&#8217;s not stopping the&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[80],"tags":[],"_links":{"self":[{"href":"https:\/\/lincolndemocrat.com\/index.php?rest_route=\/wp\/v2\/posts\/2930"}],"collection":[{"href":"https:\/\/lincolndemocrat.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lincolndemocrat.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lincolndemocrat.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lincolndemocrat.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2930"}],"version-history":[{"count":2,"href":"https:\/\/lincolndemocrat.com\/index.php?rest_route=\/wp\/v2\/posts\/2930\/revisions"}],"predecessor-version":[{"id":20571,"href":"https:\/\/lincolndemocrat.com\/index.php?rest_route=\/wp\/v2\/posts\/2930\/revisions\/20571"}],"wp:attachment":[{"href":"https:\/\/lincolndemocrat.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2930"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lincolndemocrat.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2930"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lincolndemocrat.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2930"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}